Construction of Towns Water Supply Esk to Tarong Power Station QLD

Redline was incorporated with the Western Pipeline Alliance responsible for securing vital water supply to the Brisbane municipal area during a period of extended drought.

The project was undertaken under challenging time constraints, hence requiring an accelerated construction program.

Redline’s scope included construction, hydrostatic testing and commissioning of
37,000 + m of HDPE PE100 pipeline ranging from 200mm to 355mmin diameter plus 15,000 + m of DICL 200mm pipeline construction. The terrain in which the pipeline was constructed included very steep sections, removal of hard rock and installation and remediation of environmentally sensitive areas.